This is the drywall delivery truck. I wasn't home when this came so I didn't get to see them bring it inside. Must have been a lot of trips up the driveway hill and around the dumpster.
These boards attached to the joists are where the crown molding will go when the cabinets are installed.
The electrical receptacles, switches, and connections are all roughed in.
Now, you may wonder why there is a picture of a toilet here. This bathroom is not part of the remodel even though it is on the same level, but in a fit of parallel construction, my husband stripped off the wall paper and primed the walls.
Now they are peachy to coordinate with one of the colors in the floor tiles. This is more color than we usually put on the walls, but I like it.