Sunday, August 21, 2011

End of the first week

Not much happened on Friday. More floor tear out. The kitchen floor is gone, down to the subfloor. Underneath the wood floor was tile and most of that is gone now.


The new plywood flooring layer is ready and waiting to be put down. After the demo and hauling comes the HVAC/electrical/plumbing rough-ins. I don't know how long that will take.


When we were going through the plans for this remodel and the contractor said they would be taking out everything to the studs (I mean, if there were studs), it just didn't really sink in that this is what it would look like. It looks a lot like a garage or an unfinished basement. The transformation is going to be spectacular!